skip to main
|
skip to sidebar
New Deck and Pergola
Sunday, June 28, 2009
Primed and ready
Pergola Componets
Almost there
Pergola rafters
Wednesday, June 17, 2009
New Door
Door is set and electrical is roughed-in
Great view to deck and yard.
After a quality control check of railing system, one balluster did not pass.
Roughing In
Don from BAS electric wiring sconce and outlet.
Framing of new french inswing door.
Monday, June 15, 2009
Beam wrap and railing install
Railings
Sunday, June 7, 2009
Selectwood
Selectwood is located in Portsmouth, New Hampshire
The range and quality of the clear vertical grain cedar is unsurpassed.
In the Shop
Now for the fun stuff
We are going to match the existing railing details. Ballusters are 2 1/2" on center.
Making the curved profile on the bandsaw.
Juli helping out on the routing table. She is using a template and a bearing bit to match the sweeping curve on the ballusters.
Hidden fasteners and Lattice Install
Tiger Claw fasteners driven in with block. The clip is attached with a stainless screw. Leaving no unsightly holes in deck.
The "garden" lattice being installed.
Frame inspection
After all the hangers and lagbolts were installed, we had the local inspector, Denis Nadeau inspect the structure.
lattice frame
Angle hangers and 45 degree sway braces.
Newer Posts
Older Posts
Home
Subscribe to:
Posts (Atom)
Riverview Builders
Building Team
Riverview Builders
GreenBridge Architects
Suppliers and Vendors
Greenbridge Architects
Cedar Millwork
FSC Lumber
Bear Board Decking
Town of Amesbury
Port Sheet Metal
Excavation Contractor
About Me
Riverview Company
View my complete profile
Blog Archive
▼
2009
(21)
▼
June
(12)
Primed and ready
Pergola Componets
Almost there
Pergola rafters
New Door
Roughing In
Beam wrap and railing install
Railings
Selectwood
In the Shop
Hidden fasteners and Lattice Install
Frame inspection
►
May
(9)
Followers