New Deck and Pergola

Sunday, May 31, 2009

Taking Shape

The columns and beams are set. We need to add the joist hangers and lag screws and we will be ready for inspection. We moved the tent close to shield us from the 3 days of nonstop rain and drizzle. Are you sure we are not in Seattle?

Stair footing is 1 foot deep x 1 foot wide



There are a total of 6 stringers to support the bear board decking.



Pergola Structure

The aluminum and existing cedar siding is removed to attach flashing and structure for pergola.
Grace ice and water shield and metal flashings are tucked under siding by 8"
A 10" fiberglass corinthian column is slipped over a solid 6x6 post.



Deck Framing 101

Deck ledger board also gets the full treatment of water shield and flashings.
A new french door will be cut in at the existing double hung windows

6x6 posts are continuous from footing to pergola beams


FSC Lumber

Check out the FSC web page.
http://www.fsc.org/
Sterritt lumber. The only local company with many FSC products in stock.

Thursday, May 21, 2009

Ready to build

Excavation and concrete is complete, and we are ready to build.
Certified "Green"portable restroom.

Backfill Video

Excavation

Piers are set 48" below grade
12" tubes on bigfoot footing @ 48" deep

Setting the front 3 piers


Jobsite foreman (Lucy) keeping watch



Layout

Tony D'Alelio marking out excavation
Layout stick for setting square and length.

Wednesday, May 20, 2009

New deck location

Drawings by GreenBridge Architects
The pair of double hung windows will be removed for a new french door to deck.